Field Move Preparation Work Party
Friday, 21 August 2015

The first of two field move work party weekends is scheduled for Saturday August 29th and (if needed) Sunday August 30th. We will begin at 8am each day. The goal of this event is to prepare everything possible for the move in September with the exception of the runway, charging table and solar arrays. Major projects include:

  • Remove and store stakes , label and roll up pit area astro turf (16 pcs & 540 stakes)
  • Disassemble 2 of the 3 shades (Leaving the solar panel unit intact)
  • Remove and store round posts / chain at back of pit area ( 12 posts )
  • Remove vertical ‘Run-Up’ posts ( 4 on tables, 1 south end of pit )
  • Remove pit area fencing and screening ( 24 posts )
  • Sort through storage shed

We will not be transporting any items but will need:

  • Wrenches / ¼” & 5/16” sockets and nut drivers for the shade dis-assembly
  • Hammers to disassemble fencing
  • Shovels and other tools to remove posts
  • 8’ Ladders to work on shade roofs
  • You should provide your own work gloves

If you have not already please send an e-mail to Paul Gibson at This e-mail address is being protected from spam bots, you need JavaScript enabled to view it if you are available to help this weekend. For those of you who have already sent a note as long as you received a reply from Paul you are all set. If you have not received a reply your message was not received, you can also call or text him at 707-318-5926.

 
2015 Swap Meet I
Wednesday, 18 March 2015
For the latest info on this event go to the forum

Fun fly 2014
 
From Red at NASA
Saturday, 07 March 2015
 
WCF Sunday Flying
Wednesday, 14 January 2015

Video by Jon Stychno

 
<< Start < Prev 1 2 3 4 5 6 7 8 9 10 Next > End >>

Results 26 - 30 of 163